Public Sector Construction
Here are just a few of our featured projects.
-
Palmetto Avenue Streetscape Project
Contract Value: $2.5 Million
Solutions: Lighting, Underground Electrical
The scope of work on Palmetto avenue included excavation and installation of 85 new LED streetlights, electrical service pedestals, underground work, conduits, and wiring to streetlights and irrigation. The owner of the project was the City of Pacifica.
-
AC Transit, Transit Signal Priority Project
Contract Value: $1.1 Million
Solutions: Traffic Signals, ITS
Bear Electrical Solutions provided AC Transit with the installation of traffic signal prioritization antennas and modification of controller cabinets, across 6 different agency jurisdictions and two counties in the East Bay.
-
Campbell Union School of Innovation
Contract Value: $700,000
Solutions: Underground Electrical
Working for the Campbell Union School District, Bear provided a full electrical package for the addition of four new modular classrooms and a playground. The work consisted of installing a new main switchgear, sub service feeds to new buildings, and site lighting.
-
McKee Road Vision Zero Project
Contract Value: $2.6 Million
Solutions: Traffic Signals
Working through the General Contractor Joseph J Albanese, Bear provided the City of San Jose with traffic signal modifications at five different intersections along McKee Road.
-
Reed & Grant Sports Park, Santa Clara CA
Contract Value: $4.4 Million
Solutions: Lighting, EV Charging, Underground
Our work at Reed & Grant included the furnishing and installation of site lighting, sports field lighting (musco), EV chargers, and electrical for new multi-purpose buildings. PV system (solar panels) were also installed during our work through OC Jones the general contractor.
-
Napa Valley Transportation Authority, Bus Charging
Contract Value: $270,000
Solutions: EV Charging
Working directly for the Napa Valley Transportation Authority on this charging station project, Bear provided the installation of PG&E transformer pads and service conduit, metered switchgear and Chargepoint EV chargers.
-
Hwy. 99 & Turner Rd. Roundabout
Contract Value: $850,000
Solutions: Traffic Signals, Lighting
This scope of work included installing safety lighting for a new roundabout, and signalization of the intersection at Pioneer & Cherokee. Bear worked beside OC Jones & Sons Inc. in partnership with the City of Lodi and Caltrans DOT.
-
Fremont Police AC Charging Stations
Contract Value: $55,000
Solutions: EV Charging
Bear Electrical Solutions provided the installation of new EV chargers at the Fremont police parking lot. The effort was in conjunction with Fremont Police moving towards electric vehicle patrol cars.
-
Dublin Sports Fields Lighting Project
Contract Value: $2.6 Million
Solutions: Lighting
In the City of Dublin, CA, Bear furnished and installed new Musco Sports field lighting and controls. We also retro-fitted non-Musco brand sports field lighting. The work was for performed for the Wildan Group Inc.
-
Fremont Safe & Smart Corridor Project
Contract Value: $5.9 Million
Solutions: Traffic Signals, ITS, Underground
Bear installed new video detection cameras & signal equipment throughout 37 different intersections. As part of Fremonts new Smart Corridor project, this work involved installing almost 50,000 feet of new fiber. Bear worked directly for the City of Fremont on this project.
-
City of Industry Smart Lighting Project
Contract Value: $2.3 Million
Solutions: Lighting
Working for the City of Industry, Bear provided the installation of over 3,000 SMART lighting fixtures citywide. The scope also included GIS data asset information collection and documentation.
-
Interchange Project at Hwy I-80 and Madison Ave.
Contract Value: $1.2 Million
Solutions: Traffic Signals, Lighting
Bear worked on modifications to ramp metering, highway lighting, vehicle classification, and ADA improvements at the interchange of Hwy 80 & Madison Ave. Bear worked beside Teichert Construction in partner with Caltrans DOT.
-
Capitola Adaptive Traffic Signal System
Contract Value: $830,000
Solutions: Traffic Signals, ITS, Underground
Bear worked at both City and Caltrans signalized intersections in the city of Capitola, to install Adaptive Timing hardware and software. This also included the installation of new video detection and network communication equipment.
-
Santa Clara Unified, Westwood Elementary
Contract Value: $760,000
Solutions: Underground
Our scope of work included installing all new underground raceways for relocating eight school portables across campus. Bear worked directly for the Santa Clara Unified School District on this project.
-
Newland and Hazzard Signal Modifications
Contract Value: $550,000
Solutions: Traffic Signals
Working directly for Orange County, Bear Electrical Solutions scope of work included traffic signal modifications at the intersection of Newland & Hazzard.
Private Sector Construction
Here are just a few of our featured projects.
-
Moffett Place Campus Intersection Improvements
Contract Value: $630,000
Solutions: Traffic Signals
Bear Electricals scope of work included the installation of new Traffic Signals at Innovation Way and Mathilda Ave. This project included fiber, CCTV, pedestrian improvements, and changeable message signs. Bear partnered with General Contractor Level 10.
-
700 Santana Row Building Project
Contract Value: $480,000
Solutions: Traffic Signals
Working closely with General Contractor Devcon, Bear provided traffic signal modifications and improvements at three different intersections adjacent to Santana Row to accommodate the new 700 Santana Row Building.
-
200 Park Avenue San Jose California
Contract Value: $1.1 Million
Solutions: Traffic Signals, Lighting
Bear Electrical Solutions removed the old traffic signal at 200 Park, and then installed the new traffic signal and streetlights for this intersection in the heart of downtown San Jose.
-
Adobe Software North Tower Project
Contract Value: $680,000
Solutions: Traffic Signals, Lighting
This scope of work included installing a new traffic signal for the new Adobe Building in Downtown San Jose. Additionally we installed new street lighting & flashing beacons for pedestrians along West San Fernando street. The General Contractor for this project was Devcon.
-
Coleman Highline Project, Santa Clara
Contract Value: $1.1 Million
Solutions: Traffic Signals, Lighting
At this new campus build, Bear Electrical Solutions installed new roadway lighting, new signal systems at (2) intersections, and provided modification upgrades to an existing signalized intersection.
-
UC Davis Medical Center Hospital Tower
Contract Value: $630,000
Solutions: Traffic Signals
Working beside Preston Pipelines and McCarthy Building Co., our scope included Signal modifications at the intersection of X St. & 45th. The project was to accommodate the UC Davis Medical Center Hospital Bed Replacement Tower Project.
-
Covina Bowl Historic Site Project
Contract Value: $135,000
Solutions: Lighting, Underground
Covina Bowl is a conservancy recognized historic site. Bear provided the installation of new roadside decorative streetlight poles as part of this important project.